Hau Nui
Hau Nui was commissioned in 1997 and consists of a total of 15 turbines. Seven 550 kW Enercon turbines, with a total installed capacity of 3.9 MW, were commissioned in 1996. A further eight 600 kW Enercon turbines, with a total installed capacity of 4.8 MW, were commissioned in late 2004. Map
Genesis Energy wind/Hau Nui factsheet ( 271kB)
Interested in visiting the site? Details |