Home NZ wind farms Proposed wind farms

Proposed wind farms

Wind farm developers are investigating potential wind farm sites throughout New Zealand. Good wind speeds and proximity to the transmission network are important considerations when investigating potential sites.

The following table lists projects that wind farm developers are investigating, are seeking consent for, or have consent but have not begun construction. NZWEA makes every effort to ensure that this list is comprehensive and up-to-date, but does not guarantee that all projects being investigated are included.

Not all projects under investigation or with consent will be built. In many cases projects are put on hold or abandoned after initial site investigation, as the wind resource may not be as good as anticipated.

 

SiteDeveloperProject capacity (MW)RegionResource consent application statusRMA application publicly notified
Awhitu Genesis Up to 18 Franklin Consented after appeal but on hold April 2004
Titiokura Unison/Roaring 40s Up to 48 Hastings Consented after appeal April 2005
Hawkes Bay Meridian Energy Up to 225 Hastings Consented after appeal May 2005
Taumatatotara Ventus Up to 27 Waikato Consented, phase 1 due to commence Q3 2011
Kaiwera Downs TrustPower Up to 240 Gore Consented after appeal November 2007
Taharoa Taharoa C and PowerCoast up to 54 Kawhia Consented after appeal December 2005
Project Central Wind Meridian  Up to 130 Ruapehu and Rangitikei Consented after appeal July 2008
Long Gully Windflow Up to 12.5 Wellington Consented  May 2009
Waitahora Contact Energy Up  to 156 Southern Hawkes Bay Consented after appeal September 2008
Mill Creek Meridian Up to 60 Wellington Consented after Environment Court hearing April 2008
Mt Cass MainPower Up to 78 Hurunui Application approved by the Environment Court June 2008
Hauauru ma raki Contact Energy Up to 504 Waikato Consented by Board of Inquiry September 2008
Turitea Mighty River Power Up to 180 Manawatu Consent approved by Board of Inquiry September 2011 January 2009
Slopedown Genesis Energy Southland Not yet applied
Puketiro RES Wellington Not yet applied
Hurunui Meridian Energy 75.9 Hurunui Application referred direct to the Environment Court February 2011
Windy Peak Meridian Energy Wairarapa Not yet applied
Castle Hill Genesis Energy Up to 858 Wairarapa Consent application lodged with Councils August 2011
Puketoi Mighty River Power Up to 159 Wairarapa Consent application lodged with Councils September 2011
Lake Grassmere Dominion Salt Marlborough Consented July 2011
Mt Stalker Waitaki Wind Otago Site under investigation
Flat Hill Energy3 6.8 Southland Applied October 2011
Mt Munro Meridian Energy 20 Wairarapa Consent applied for
January 2012
Blueskin Bay Local community project 2 Otago Design and local consultation
Pouto Forest Meridian Energy 300 Northland Site under investigation
Ahipara Gumfields Meridian Energy 99 Northland Site under investigation

Projects that will not proceed

Site Developer Region Reason project will not proceed
Motorimu Allco Wind Energy Manawatu Consent surrendered September 2009
Te Waka Unison Hawkes Bay Re-application declined by the Environment Court, 2009
Maungatua NZ Windfarms Otago Developer decided not to apply for concent after site investigation, September 2009
Project Hayes Meridian Energy Otago Developer withdrew from consent process 2012 due to having since developed more commercially attractive options